Copenhagen - New Metroline, M5 Transportation System
Metroselskabet I/S
Beskrivelse
This tender presents a substantial opportunity for prospective contractors to bid for the M5 Transportation System South package (TSS), a critical component of the Copenhagen metro system's expansion. This project is of significant strategic importance, as the M5 line is a fully automated driverless metro system that will not only enhance passenger service on existing metro corridors but is also planned to extend connectivity to emerging urban development areas, including Kløverparken, Refshaleøen, and Lynetteholm in the East Harbour. The M5 is to operate as an independent system, ensuring that its construction and subsequent operation do not disrupt the existing M1-M4 metro lines. The current tender, Phase 1, encompasses the southern section of the line, from København H to north of v/Prags Boulevard, with an anticipated operational commencement in 2036. The broader vision includes the northern section with an anticipated operatonal commencement of the last part of the northern section in 2045 (included in the transportation system contract (TSS-contract) as options) and a potential future extension to form a ring line, signifying a long-term commitment to urban mobility. The procurement comprises the following, together constituting a mixed procurement within the meaning of Article 5 (2) of the Utilities Directive: 1) A TRANSPORTATION SYSTEM for M5 south encompassing the subsystems rolling stock (passenger vehicles, service vehicles and rescue trolleys), railway infrastructure (signaling system and other subsystems, excluding permanent way and power supply "on the line"), and a CMC (control and maintenance center). Furthermore, O&M supplies (supplies related to the O&M providers operation and maintenance activities such as maintenance plans and training). “On the line” refers to deliveries outside the CMC (as the Transportation System Contractor (TSC) is itself responsible for power supply and permanent way within the CMC). The integration of the mentioned TS-subsystems and the integration of the scope of supply of the CWC into the Transportation System (including but not limited to permanent way and power supply on the line) is also part of the TSC's responsibilities and forms part of the TSS-contract. Rolling stock, railway Infrastructure and the CMC are further described in M5-2-TSS-SW (Scope of Work) of the tender documents. 2) MAINTENANCE SERVICES following hand over of the Transportation System related to the continued maintenance of the Transportation System (hereinafter Maintenance Services). The TSS-contract covers both the Transportation System and the Maintenance Services. The Maintenance Services are governed by a separate maintenance contract forming an attachment to the TSS-contract (hereinafter Maintenance Contract) The purchase of the Transportation System and the Maintenance Services should therefore be seen as a whole and only one Tenderer will be awarded the contracts. The expected scope and characteristics of the two contracts are described in the tender documents. 3) OPTIONS Three (3) options are included in the TSS-contract: Option 1: The purchase of up to 5 additional passenger vehicles. Option 2: The extension of the transportation system from Prags Boulevard to Refshaleøen. Option 3: The extension of the transportation system from Refshaleøen to Lynetteholm. Metroselskabet’s requirements relating to the Transportation System are set out in the tender documents, including the draft TSS-contract and the Scope of Works document (M5-2-TSS-SW). Requirements may be developed and changed during the competitive dialogue. As regards the Maintenance Contract, no draft contract or draft specifications are included in the tender documents at this stage. This reflects the fact that a central element of the competitive dialogue will be to explore the scope and structure of the Maintenance Contract, including the distribution of maintenance tasks between the TSCand the future operator of the Transportation System …
- 45234123 Arbejder i forbindelse med delvis underjordiske bybaner
- 45000000 Bygge- og anlægsarbejder
- 45213320
- 45234100 Byggearbejder i forbindelse med jernbaner
- 45234120 Arbejder i forbindelse med bybaner
- 45234122
- 45234180
- 45316200
- 45316210
- 45316213
- 34621200
- 34622100
- 34632000
- 34632200
- 34632300
- 34940000
- 34942000
- 34943000
- 50220000 Reparation, vedligeholdelse og tilhørende tjenesteydelser vedrørende jernbaner og andet udstyr
- 50222000
- 34620000
- 50224000
- 50224200
- 71311100
- 71311230 Ingeniørarbejder i forbindelse med jernbaner
Flere udbud
- Åben8 dage tilbageAsfaltudbud Randers Kommune - Rammeaftale 2027-2028Randers KommuneTilbudsfrist 1. december 2026Anslået værdi 64.000.000 kr.
- Åben37 dage tilbageBelægninger-åbent landOdense KommuneTilbudsfrist 30. december 2026Anslået værdi 105.000.000 kr.
- Åben53 dage tilbageEtablering af ny 150 kV Højspændingsstation, Hornbæk - 19/08517Energinet Eltransmission A/STilbudsfrist 15. januar 2027Anslået værdi 30.000.000 kr.
- Åben56 dage tilbageBelægninger-åbent landOdense KommuneTilbudsfrist 18. januar 2027Anslået værdi 105.000.000 kr.
- Åben57 dage tilbageUdvidelse af vejnettet ved Bouet i NørresundbyAalborg kommuneTilbudsfrist 19. januar 2027Anslået værdi 57.000.000 kr.
- Åben128 dage tilbageGENOP-BR Renovering af brolægning på fortove. Forlængelse af dynamisk indkøbssystem til 2027VejdirektoratetFrist for ansøgning om deltagelse 31. marts 2027Anslået værdi 50.000.000 kr.
Læs udbudsmaterialet på minutter, ikke timer
Upload udbudsmaterialet i Planium og få kravmatrix, risici og en go/no-go-vurdering fra AI. Gratis at komme i gang.
Kilde: TED (Tenders Electronic Daily), EU’s Publikationskontor. Videreanvendelse i henhold til Kommissionens afgørelse 2011/833/EU. Opdateret 23. november 2026.