SMC-6.2 Power Transformer and 132 kV Gas Insulated Switchgear
HOFOR Fjernvarme P/S
Beskrivelse
The procurement concerns the design, manufacture, factory testing, delivery, site assembly, testing, commissioning and handing over of equipment for the Power Transformer and 132 kV SF6 Free Gas insulated switchgear installation at the Svanemøllen Energy Centre (SMC). The procurement is divided into the following lots: Lot 1 – Power Transformers Design, manufacture, factory testing, delivery, site assembly, testing, commissioning and handing over of power transformers, including cooling equipment, accessories, auxiliary, documentation and training. Lot 2 – 132 kV Gas Insulated Switchgear (GIS) Design, manufacture, factory testing, delivery, site assembly, testing, commissioning and handing over of 132 kV SF6 Free Gas Insulated Switchgear, including associated local control cubicles, monitoring equipment, accessories, auxiliary, documentation and training. The detailed scope of each lot is described in the technical requirements and the contract documents.
The procurement concerns the design, manufacture, factory testing, delivery, site assembly, testing, commissioning and handing over of equipment for the Power Transformer and 132 kV SF6 Free Gas insulated switchgear installation at the Svanemøllen Energy Centre (SMC). This lot is lot nr. 1 Power Transformer.
The procurement concerns the design, manufacture, factory testing, delivery, site assembly, testing, commissioning and handing over of equipment for the Power Transformer and 132 kV SF6 Free Gas insulated switchgear installation at the Svanemøllen Energy Centre (SMC). This lot is lot nr. 2 132 kV SF6 Free Gas insulated switchgear.
- 31100000 Elektriske motorer, generatorer og transformatorer
- 31000000 Elektriske maskiner, apparatur, udstyr og forbrugsartikler; belysning
- 31170000 Transformatorer
- 31171000
- 31172000
- 31200000
- 31213200
- 31214000 Koblingsudstyr
- 31214500
- 31682540
- 45315400
- 45315700
Flere udbud
- TildeltUdbud af Dobbeltskinne indendørs 60 kV AIS-anlæg til station Drejebænken (Fyn)VORES ELNET A/SOffentliggjort 31. august 2026Hitachi Energy Denmark A/S · 12.772.600 kr.
- AfsluttetUdbud af Aftale vedrørende Hybrid Onshore Power System at Port of AalborgPort of Aalborg A/SOffentliggjort 2. april 2026Anslået værdi 60.700.000 kr.
- TildeltSGQ02 Havvandskammer Sundkrogsgade K1 entreprise jord/betonHOFOR Fjernvarme P/SOffentliggjort 2. marts 2026MT Højgaard Danmark A/S · 27.000.000 kr.
- TildeltHavvandspumpe Nordhavn 20 MWHOFOR Fjernvarme P/SOffentliggjort 27. februar 2026Multi Køl & Energi A/S · 90.000.000 kr.
- TildeltRådgivning til opførelse af ny varmecentral ved Svanemøllen. Delaftale 11. Delprojektleder og fagspecialist til Bygning inkl. ArkitektHOFOR Fjernvarme P/SOffentliggjort 13. januar 2026COWI A/S (Industri, energi, kraftværker, fjernvarme/køling) · 35.510.000 kr.
- TildeltRådgivning til opførelse af ny varmecentral ved Svanemøllen. Delaftale 6. Fagspecialister til varmepumpeHOFOR Fjernvarme P/SOffentliggjort 13. januar 2026Ingeniør Huse · 4.025.000 kr.
Læs udbudsmaterialet på minutter, ikke timer
Upload udbudsmaterialet i Planium og få kravmatrix, risici og en go/no-go-vurdering fra AI. Gratis at komme i gang.
Kilde: TED (Tenders Electronic Daily), EU’s Publikationskontor. Videreanvendelse i henhold til Kommissionens afgørelse 2011/833/EU. Opdateret 23. november 2026.