Marketconsultation Collective Heating plant
Warmtebedrijf Oost-Wageningen B.V.
Omschrijving
This project aims to establish a complete district heating plant to supply 461 consumers in Wageningen, the Netherlands. The pipe network has already been contracted, and the tender for the heating plant itself is now imminent. The project is unique in that the heating plant must be integrated into an existing building located near protected nature and residential areas, where strict building regulations apply.
The plant will be designed for a peak load of 2.7 MW, using a combined solution with a heat pump and gas boiler. A key consideration is compliance with the Netherlands’ strict nitrogen-emission framework, which requires that the gas boiler may only be installed once proven nitrogen savings have been achieved elsewhere in the project. This introduces specific requirements for project phasing and technical integration, ensuring that environmental and operational objectives go hand in hand.
We are pleased to invite you to a joint partnering event on the 20th of February focused on upcoming tenders from four cooperative district heating networks in the Netherlands! See the added link to the formal invitation and registration page.
Invitation: https://energie-samen.email-provider.eu/web/oatc2ypk3h/rjfx56vxc1/gbieypcgsn/fagznxnqyy?lp-t=[…]
Registration form: https://forms.office.com/e/X94mg2rwfu
- 42511110 Warmtepompen
- 45350000 Werktuigbouwkundige installaties
Meer aanbestedingen
- Lopendnog 30 dagenPreferred suppliers werktuigbouwkundige werkzaamhedenVrije Universiteit AmsterdamSluitingsdatum 11 november 2026
- Lopendnog 35 dagenWerktuigbouwkundig onderhoudWaterschap Hunze en Aa'sSluitingsdatum 16 november 2026
- Lopendnog 37 dagenHVAC en RWA beheer, onderhoud en vervangingGVB Infra B.V.Sluitingsdatum 18 november 2026
- Lopendnog 37 dagenHVAC en RWA beheer, onderhoud en vervangingGVB Infra B.V.Sluitingsdatum 18 november 2026
- Lopendnog 37 dagenHVAC en RWA beheer, onderhoud en vervangingGVB Infra B.V.Sluitingsdatum 18 november 2026
- Lopendnog 37 dagenHVAC en RWA beheer, onderhoud en vervangingGVB Infra B.V.Sluitingsdatum 18 november 2026
Lees de aanbestedingsstukken in minuten, niet in uren
Upload de stukken in Planium en krijg een eisenmatrix, risico’s en een go/no-go-advies van AI. Gratis beginnen.
Bron: TenderNed — Rijksoverheid (Ministerie van Economische Zaken). Open data van TenderNed; hergebruik met bronvermelding. Bijgewerkt 12 oktober 2026.