Avsluttet

Contract - 420768 Fossumdalen stage 5-6, Pipeline route.

Trondheim kommune

Beskrivelse

"Fossumdalen stage 5-6 - Ledningstrasé" is part of a larger water and sewage project in Trondheim municipality that has run, and shall run, over several stages. The aim is to reduce the amount of overflow supplied to The River Nidelva from the sewage network by establishing a separated main stem for W&S from the sewage zone Lerkendal where surface water is led to the River Nidelva, and waste water is fed by a self-fall to Høvringen treatment facility. In "Fossumdalen stage 5-6, Ledningstrasé", the existing overflow (OP04) shall be established in "Fossumdalen stage 4" connects to the Høvringen sewage tunnel via a diving pipeline under the River Nidelva with a flushing magazine. The pipeline installation starts with drilling rock from the west side of Osloveien south of Stavne to Høvringen sewage tunnel. Under osloveien, a sewage pipeline is laid through a completed freighter and dug a ditch to the east between the properties in Sivert Dahlens veg. Pipelines that controlled drilling will be executed under the River Nidelva to Valøya. Over Valøya and up to Valøyslyngen, pipelines are to be dug in a ditch. Pipelines in valøyslyngen shall be executed in an increased dimension, which together with the existing volume in the existing sewage pipeline upstream OP04 (new overflow) functions as flushing magnet for the diving line. The flushing magazine shall be emptied via a flush manhole and the facility shall be adapted for the supply of water from the municipality ́s water pipelines. A new water and sewage system shall also be constructed from OP04 (a new overflow) to the junction of Alfred Larsens gate and Valøyslyngen. From the junction of Alfred Larsens gate and valøyslyngen, a new water pipeline will be laid in the same route as the existing water pipeline to Holtermanns road. The following turnkey contracts will be transported to the general contractor:1 "Fossumdalen stage 5-6 - Sewage pump station" (the existing sewage pump station APS is replaced by a smaller and more modern sewage pump station APS04.2 "Fossumdalen section 5-6, HVAC, management and automation"The general contractor will take over, among other things, the engineering design and coordination responsibility for these two turnkey contracts. As part of "Fossumdalen stage 5-6, Ledningstrasé", a sheet box shall be prepared for a sheet box for setting down the new APS04, and the existing Water and Sewage will be connected to the new APS04.

  • 45200000 Works for complete or part construction and civil engineering work
  • 45000000 Construction work
  • 45100000 Site preparation work
  • 45230000 Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
  • 45231100 General construction work for pipelines
  • 45231300 Construction work for water and sewage pipelines
  • 45231400
  • 45232000 Ancillary works for pipelines and cables
  • 45232100 Ancillary works for water pipelines
  • 45232150
  • 45232411
  • 45240000 Construction work for water projects

Flere konkurranser

Anbud Norge

Les konkurransegrunnlaget på minutter, ikke timer

Last opp konkurransegrunnlaget i Planium og få kravmatrise, risikoer og en go/no-go-vurdering fra AI. Gratis å komme i gang.

Kilde: TED (Tenders Electronic Daily), EUs publikasjonskontor — kunngjort via Doffin. Gjenbruk etter kommisjonsbeslutning 2011/833/EU. Oppdatert 12. oktober 2026.