Avsluttet

National road 426 Eigerøy bridge

Statens vegvesen

Beskrivelse

The main aim of the project is to replace the current Eigerøy bridge with a new bridge which shall be constructed parallel to the south side of the existing one. When the new bridge is finished, shall the old one be demolished. In addition a foot and cycle path shall be established south along the Hovlandsveien, on the current national road 426. Associated roads in the area shall also be upgraded in order to ensure comprehensive improvement of the infrastructure. New Eigerøy Bridge * The new Eigerøy bridge shall be constructed on the south side of the existing bridge. When the new the bridge has been completed, the old bridge shall be demolished. The new bridge is planned as a type of "Concrete slab bridge with blasted columns" with a length of approx. 272 m. * The bridge should typically have a total width of 13.6 m. * The sailing rectangle shall be (HxB) 22.5 m in 23.5 m. Other constructions * New culvert Lauåsen internal dimension (BxH) 3.5 m x 3.1 m * Support construction along Hovlandsvegen * Retaining wall and support construction at Hovlandsvegen 7 and 9 * Retaining wall along Old Eigerøyveien. * Other minor walls and support structures uncovered by the engineering design. need for. A new foot and cycle path shall be constructed as the main solution for walking and cycling. Some parts of the stretch will have pavements. * A new three-armed roundabout shall be constructed at Eigerøy. * The public transport stops along the stretch shall be upgraded to universal design and be equipped with shelters for better comfort and accessibility. * A new national road 426 shall be constructed on the east side of the new bridge, approx. 200 m eastwards. * Approx. 230 m new exit and local road from Langholmveien shall be constructed. Along Hovlandsveien * Along Hovlandsveien, National Road 426, a new foot and cycle path shall be constructed on the east side from the junction with Nyåskaiveien to the new Eigerøy bridge. This road shall connect on foot and cycle paths on the new bridge. The foot and cycle path is approx. 750 m long. The width of the new foot and cycle path varies between 2.5 and 3.0 m plus the shoulder and railing room. * The farthest south continues the current foot and cycle path on the west side of Hovlandsveien up to the existing pedestrian crossing at the public transport stops. See the tender documentation for detailed information on the contract work.

  • 45000000 Construction work
  • 44212100
  • 45231300 Construction work for water and sewage pipelines
  • 45232000 Ancillary works for pipelines and cables
  • 45233124
  • 71322300
  • 71322500

Flere konkurranser

Anbud Norge

Les konkurransegrunnlaget på minutter, ikke timer

Last opp konkurransegrunnlaget i Planium og få kravmatrise, risikoer og en go/no-go-vurdering fra AI. Gratis å komme i gang.

Kilde: TED (Tenders Electronic Daily), EUs publikasjonskontor — kunngjort via Doffin. Gjenbruk etter kommisjonsbeslutning 2011/833/EU. Oppdatert 12. oktober 2026.