Tildelt

BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station

Gjøvik Kommune

Tildeling

Vinner
Ikke oppgitt
Kontraktsverdi
95 000 000 SEK

Beskrivelse

Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as the establishment of a connection point for the continuation of the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment plant shall be established. In this contract, the establishment of a raw water pump station with the execution of pipelines from ENT2 up until the land pipeline contract ("ENT3") shall be executed.

  • 44160000 Pipeline, piping, pipes, casing, tubing and related items
  • 45000000 Construction work
  • 45232152 Pumping station construction work
  • 45232150
  • 45232100 Ancillary works for water pipelines
  • 45232000 Ancillary works for pipelines and cables
  • 45231300 Construction work for water and sewage pipelines
  • 45240000 Construction work for water projects
  • 45232430 Water-treatment work

Flere konkurranser

Anbud Norge

Les konkurransegrunnlaget på minutter, ikke timer

Last opp konkurransegrunnlaget i Planium og få kravmatrise, risikoer og en go/no-go-vurdering fra AI. Gratis å komme i gang.

Kilde: TED (Tenders Electronic Daily), EUs publikasjonskontor — kunngjort via Doffin. Gjenbruk etter kommisjonsbeslutning 2011/833/EU. Oppdatert 12. oktober 2026.