Change of contract, Turnkey contract - 330123/430129 Fredlybekken lower part stage 4 Sluppen - controlled drilling.
Trondheim kommune
Beskrivelse
Trondheim municipality and Søbstad AS entered into a contract in September 2023 for a turnkey contract for Fredlybekken, where the original specified execution method for the No-dig works was controlled drilling. As a result of demanding, unforeseen ground conditions, the method was initially tried to change to pilot pipe drilling at the start of 2026. Despite extensive ground surveys and thorough technical assessments using the builder, turnkey contractor, sub-contractors, consultants and external experts in the field, none of the chosen methods have succeeded in establishing the wastewater pipe. To ensure that the pipeline installation is completed in accordance with the contract function requirements, it is necessary to change the execution method to micro tunnelling with a closed front for the remaining No-dig works for the establishment of the wastewater pipeline. The change is assessed as permitted in accordance with the Supply Regulations § 24-1 first section letter d as the following three terms are met: The amendment is necessary: The method change to tunnelling is strictly necessary for the contracting authority to fulfil the contract ́s purpose and ensure planned functionality for the surface water and waste water pipelines. To ensure that the costs of the change are kept at a necessary and competitive level, the contractor has completed a competition for the tunnelling. Unforeseen circumstances and vigilant contracting authorities: The need for the change is due to ground conditions that the careful contracting authority cannot foresee when the contract is signed. Thorough ground surveys were carried out in different formats, both before the start-up and during the project. The extent of the unforeseen, inhomogenous landslides and blockstones in the ground, however, it was not possible to uncover until the work started. The procurement ́s overall character does not change: The amendment only applies to the technical execution method for a part of the No-dig route. The main service, the purpose of the contract, the distribution of responsibility and risk remain unchanged. The terms in the utilities regulations § 24-1 first section letter d are fulfilled. The amendment will be announced in accordance with the Utilities Regulations § 24-1 third section, cf. § 17.1.
- 45000000 Construction work
- 45200000 Works for complete or part construction and civil engineering work
- 45232000 Ancillary works for pipelines and cables
Flere konkurranser
- Åpen4 dager igjenDesign-build contract for Fire Station SouthOslo kommune v/ Oslobygg KFTilbudsfrist 27. november 2026
- Åpen7 dager igjenCompetition - Framework agreement for renovation no-dig, water pipelines including manholes.Trondheim kommuneTilbudsfrist 30. november 2026Anslått verdi 600 000 000 kr
- ÅpenDynamic purchasing system - procurement of educational services - alternative training arenas for the primary and lower secondary schools.Trondheim kommuneFrist for forespørsel om å delta 31. mai 2030Anslått verdi 13 000 000 kr
- ÅpenDynamic purchasing system for contractor services - Vennesla municipalityVennesla kommuneFrist for forespørsel om å delta 20. april 2032Anslått verdi 100 000 000 kr
- ÅpenDynamic purchasing system for contractor services - Vennesla municipalityVENNESLA KOMMUNEFrist for forespørsel om å delta 20. april 2032Anslått verdi 100 000 000 kr
- AvsluttetBridge maintenance area mid 2027 - 2028Statens vegvesenPublisert 12. oktober 2026Anslått verdi 400 000 000 kr
Les konkurransegrunnlaget på minutter, ikke timer
Last opp konkurransegrunnlaget i Planium og få kravmatrise, risikoer og en go/no-go-vurdering fra AI. Gratis å komme i gang.
Kilde: TED (Tenders Electronic Daily), EUs publikasjonskontor — kunngjort via Doffin. Gjenbruk etter kommisjonsbeslutning 2011/833/EU. Oppdatert 12. oktober 2026.