Boxbay Enabling Civil Works
LONDON GATEWAY PORT LIMITED
Description
The enabling works consist of the installation of new below ground utility ducting; new fire water pipework; new fire hydrants; and new drainage pipework along with associated access chambers. Additionally, existing electrical services and equipment will be diverted/relocated including an existing feeder pillar; an electric vehicle charger; supplies for existing yard lighting; and other small power supply requirements. To facilitate this, demolition and removal of existing yard areas will be required; excavation for the installation of the above services; and the reinstatement of new yard finishes. It is intended that the enabling works commence in April 2026 for a duration of 3 months. Civil works required include: • Installation of new utility ducting and chambers • Removal/diversion of existing electrical supplies including feeder pillars, EV charger etc. • Installation of HV cabling • Installation of Earthworks and heavy duty pavement • Installation of new surface water drainage pipework • Installation of new fire hydrants and pipework
- 45000000 Construction work
More tenders
- ClosedLondon Gateway Berth 5 Structured Cabling SystemLONDON GATEWAY PORT LIMITEDPublished 4 June 2026Estimated value £1,600,000
- NoticeLondon Gateway - BOXBAY Main WorksLONDON GATEWAY PORT LIMITEDPublished 24 April 2026Estimated value £30,000,000
- NoticeLondon Gateway - Second Rail Terminal Phase 2LONDON GATEWAY PORT LIMITEDPublished 17 March 2026Estimated value £15,000,000
Read tender packs in minutes, not hours
Upload the tender documents to Planium and get a compliance matrix, risks and a bid/no-bid recommendation from AI. Free to start.
Source: Find a Tender Service — UK Cabinet Office. Open Government Licence v3.0. Updated 12 October 2026.