GBC - Weyside Urban Village - Phase 1 and 3 Infrastructure
Guildford Borough Council
Description
The Works The works for this project involve the infrastructure works relating to the Weyside Urban Village Phases 1 and 3 development plots. In summary, the Works under this Contract will comprise: • Necessary surveys, and investigations and monitoring. • Demolition of remaining buildings (including the existing Guildford Council Depot) • Vegetation clearance, tree felling and site strip • Topsoil stripping • Sitewide remediation of contamination (where required) • Site platform and levelling • Drainage infrastructure, pipework, manholes, attenuation tanking, petrol interceptors • Swales and attenuation basins • Surface water outfalls • Utility infrastructure, ducting, chambers, pipework • Highway formations • Signage, markings, street furniture, street lighting • Non-motorised Vehicles works, encompassing various pedestrian and cycle path improvements • S278 Junction Works • Maintain the reptile translocation fencing and associated inspections Location Location of Project: • Area named Phase 1: Weyside Urban Village (Slyfield regeneration Programme), Land to the south of Bellfield Allotments, Guildford, GU1 1QG. • Area named Phase 3: Weyside Urban Village (Slyfield regeneration Programme), existing Guildford Borough Council’s Depot site, Guildford GU1 1QE. • Area named NMU: Farm Close, Section 106 ref 6, Mangles Road Section 106 ref 10.4 and Towpath improvements section 106 ref 8-9 Works by Others During these works there are likely to be the following works being undertaken by the Employer and statutory undertakers on and or around the site, including but not limited to; • Ground water monitoring. • Other works may be occurring adjacent to the site on the wider master site plan. • Ecological watching brief by an independent ecologist • Archaeological watching brief by an independent archaeologist • Utilities works / diversions (which do not form part of the Scope of these works). • General s278 Highways works • Works associated with the relocation of the Sewerage Treatment Works • Off site demolitions
- 45000000 Construction work
- 45211100 Construction work for houses
- 45211350 Multi-functional buildings construction work
More tenders
- Pipeline noticeYork Road RefurbishmentGuildford Borough CouncilPublished 30 September 2026
- Pipeline noticeRefurbishment of Lysons Enterprise EstateGuildford Borough CouncilPublished 30 September 2026
- Pipeline noticeSuicide Prevention Works – Multi-Storey Car ParksGuildford Borough CouncilPublished 24 September 2026
- ClosedOld Farm Place Playground Design and InstallGuildford Borough CouncilPublished 28 August 2026
- Pipeline noticeWeyside Urban Village - Phase 4 Enabling Works and InfrastructureGuildford Borough CouncilPublished 12 August 2026
- ClosedTrees and Countryside Framework 2026Guildford Borough CouncilPublished 11 June 2026
Read tender packs in minutes, not hours
Upload the tender documents to Planium and get a compliance matrix, risks and a bid/no-bid recommendation from AI. Free to start.
Source: Find a Tender Service — UK Cabinet Office. Open Government Licence v3.0. Updated 12 October 2026.