Pipeline notice

183592 CP7 Earthworks Asset Monitoring Capital Delivery Western Framework

NETWORK RAIL INFRASTRUCTURE LIMITED

Description

The project scope is for surveys and monitoring in the W&W route for Geotech. This will roughly consist of four key workstreams. The first work stream is the installation of Earthwork Failure detection systems, these are utilised to detect failures and inform Route Control of earthwork movement. The second is Cant and Twist Sensors, these are track sensors installed at rail level to detect movement in embankments. The third is survey works called Ground Investigation Assessments (GIA), this is pre renewals works to install monitoring such as Piezometers/inclinometer to detect movement or changes in earthworks, technical reports and further recommendations may be requested as part of this workstream. The final is the ongoing maintenance of existing assets, ensuring they are kept live, functional and the systems communicate with route control. For EFD sites this might mean vegetation clearance around cameras, replacement when they are damaged and similar with the Cant and Twist schemes.

  • 45120000 Test drilling and boring work
  • 71332000 Geotechnical engineering services
  • 71351500 Ground investigation services

More tenders

Tenders United Kingdom

Read tender packs in minutes, not hours

Upload the tender documents to Planium and get a compliance matrix, risks and a bid/no-bid recommendation from AI. Free to start.

Source: Find a Tender Service — UK Cabinet Office. Open Government Licence v3.0. Updated 12 October 2026.