Closed

Design and Build Works for Mains Sewer Connection at High Lodge

Forestry Commission

Description

The works comprise the detailed design, construction, testing and commissioning of a new foul sewer system to replace the existing on site sewage treatment arrangements at High Lodge. The works include the provision of an approximately 2,037 m foul sewer system, comprising: • Rising/pumping main • gravity sewer main • pumping station • holding tank • a connection to the existing Anglian Water foul sewer network. The works are provided along the pre determined route identified by Forestry England.

  • 71800000 Consulting services for water-supply and waste consultancy
  • 71500000 Construction-related services
  • 71300000 Engineering services
  • 45230000 Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork

More tenders

Tenders United Kingdom

Read tender packs in minutes, not hours

Upload the tender documents to Planium and get a compliance matrix, risks and a bid/no-bid recommendation from AI. Free to start.

Source: Find a Tender Service — UK Cabinet Office. Open Government Licence v3.0. Updated 12 October 2026.