Design and Build Works for Mains Sewer Connection at High Lodge
Forestry Commission
Description
The works comprise the detailed design, construction, testing and commissioning of a new foul sewer system to replace the existing on site sewage treatment arrangements at High Lodge. The works include the provision of an approximately 2,037 m foul sewer system, comprising: • Rising/pumping main • gravity sewer main • pumping station • holding tank • a connection to the existing Anglian Water foul sewer network. The works are provided along the pre determined route identified by Forestry England.
- 71800000 Consulting services for water-supply and waste consultancy
- 71500000 Construction-related services
- 71300000 Engineering services
- 45230000 Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
More tenders
- Open21 days leftDesign and installation of Public Toilet Block at RendleshamForestry CommissionDeadline 2 November 2026Estimated value £130,000
- NoticeOnshore Wind Energy Development – NorthumberlandForestry CommissionPublished 9 October 2026
- Pipeline noticeQuarrying - North DistrictForestry CommissionPublished 10 September 2026
- ClosedToilet Block Refurbishment at Santon DownhamForestry CommissionPublished 26 August 2026Estimated value £95,000
- Pipeline noticeEast District Deer Larder ProjectForestry CommissionPublished 6 August 2026
- Pipeline noticeCycle Trails Framework - Design and ConstructionForestry CommissionPublished 29 July 2026Estimated value £4,000,000
Read tender packs in minutes, not hours
Upload the tender documents to Planium and get a compliance matrix, risks and a bid/no-bid recommendation from AI. Free to start.
Source: Find a Tender Service — UK Cabinet Office. Open Government Licence v3.0. Updated 12 October 2026.