Design and Installation of a Solar Farm and Battery Energy Storage System (BESS) at Docks Way Landfill Site
Cyson Cymru
Description
Cyson Cymru, on behalf of Newport City Council (NCC), is seeking Engineering, Procurement and Construction (EPC) proposals for the turnkey design, installation, and commissioning of the solar farm and a DC coupled battery with a 400V grid connection at the Newport City Council’s recycling centre depot in Newport, to form a fully compliant and working installation. It is anticipated that the EPC contract will be awarded in 2026, and the design and construction will be undertaken in 2026/7. The Contractor will be responsible for the supply, installation, and maintenance of a solar photovoltaic and battery system (the ‘Works’) up to 1.1MWp in gross PV capacity with a 2MWh DC battery energy storage system (BESS) on the land shown in Appendix 19.3 of the Specification, and located at grid reference ST306857.
- 45000000 Construction work
- 09332000 Solar installation
- 09331000 Solar panels
- 31000000 Electrical machinery, apparatus, equipment and consumables; lighting
More tenders
Read tender packs in minutes, not hours
Upload the tender documents to Planium and get a compliance matrix, risks and a bid/no-bid recommendation from AI. Free to start.
Source: Find a Tender Service — UK Cabinet Office. Open Government Licence v3.0. Updated 12 October 2026.