Nant y Mwyn 25-26 Scour Protection Works
Mining Remediation Authority
Description
The purpose of these works is to prevent the Nant y Bai watercourse from continuing to scour (causing active erosion of) spoil heaps that make up its banks and causing mobilisation of metal-rich spoil into the watercourse. It is proposed to install a mixture of scour protection interventions including rock filled rolls and bags, geotextile matting and wooden stakes at a number of discrete areas along the bank to stabilise the spoil and prevent ongoing erosion by the Nant y Bai. We would welcome input from the Contractor regarding current design methodology based on previous experiences. The Works comprise the following: • Install scour protection measures in accordance with the drawings; • Install slope stabilisation measures in accordance with the drawings; • Supply and install 150No. rock filled bags as specified on the drawings and as directed on site to provide scour protection in Areas 3, 5 and 6; • Translocate Purple Moor grass into the working area in accordance with the drawings. The source of Purple Moor grass to be agreed with the ecological supervisor but shall be within the Site; • Install silt traps in accordance with the drawings; • Install an overland pipe with associated capture structure and outfall structure in accordance with the drawings; • Deliver plant and materials along designated routes to limit impact on the protected ecology and provide any equipment necessary to minimize the impact on the designated routes. This may include helicopters to aid in load lifting and placement of rock roll bags; and • Plan and execute temporary flow diversion measures to enable the Works in the river bed to be completed. The Works must be carried out, including transportation of plant and materials, in a way that: • Does not cause undue harm to the local ecology, including plants, trees and particularly the protected Calaminarian habitats (comprising metallophyte flowering and non-flowering plant species); • Does not damage local heritage features, including historic mining structures and artefacts; • Does not cause undue disruption to the local community; • Does not cause damage to existing services; • Does not cause damage to the forest track road, • Is in accordance with the relevant Environmental Action Plan (EAP) as prepared by the Mining Remediation Authority and agreed with NRW.
- 45112450 Excavation work at archaeological sites
More tenders
- AwardedCA18/05485Mining Remediation AuthorityPublished 29 September 2026Soil Engineering Geoservices Ltd
- Pipeline noticeWemyss Metal Mine WorksMining Remediation AuthorityPublished 21 September 2026
- NoticeGround Stabilisation Works by Drilling and Grouting Framework RenewalMining Remediation AuthorityPublished 19 August 2026
- NoticeGround Investigation Framework RenewalMining Remediation AuthorityPublished 18 August 2026
- AwardedLangton Mine Water Treatment Scheme (MWTS) Design and BuildMining Remediation AuthorityPublished 31 July 2026J N Bentley Limited
- AwardedGround Investigations WorksMining Remediation AuthorityPublished 13 July 2026Ian Farmer Associates
Read tender packs in minutes, not hours
Upload the tender documents to Planium and get a compliance matrix, risks and a bid/no-bid recommendation from AI. Free to start.
Source: Find a Tender Service — UK Cabinet Office. Open Government Licence v3.0. Updated 12 October 2026.