Description

Description of WorksA brief overview of the project/services you are procuring, you should provide enough detail to encourage prospective suppliers to download the full spec/ITT etc Fire Safety Works will be allocated and carried out against the Risk Rated Programme in closecoordination with SHP.Fire Safety Works will include, but not be limited to the following and will incorporate all itemsidentified in the inspections, surveys and Risk Rated Programme of Works as developed: -● Communal areas;● Individual properties;● Roof spaces areas, including water tank and plant rooms;● Loft spaces;● Basement areas;● Boiler and plant rooms;● Intake cupboards;● Vertical and horizontal service risers (where demountable panels exist);● Lift shafts and pits;● Bin store locations;● Refuse chutes;● Garage blocks;● Storage areas;● Any other unspecified areas.

  • 45000000 Construction work
  • 45300000 Building installation work
  • 45340000 Fencing, railing and safety equipment installation work
  • 45343000 Fire-prevention installation works
  • 45343100 Fireproofing work
  • 45343200 Firefighting equipment installation work
  • 45343210 CO2 fire-extinguishing equipment installation work
  • 45343220 Fire-extinguishers installation work
  • 45343230 Sprinkler systems installation work
  • 71000000 Architectural, construction, engineering and inspection services
  • 71300000 Engineering services
  • 71310000 Consultative engineering and construction services
  • 71317000 Hazard protection and control consultancy services
  • 71317100 Fire and explosion protection and control consultancy services

More tenders

Tenders United Kingdom

Read tender packs in minutes, not hours

Upload the tender documents to Planium and get a compliance matrix, risks and a bid/no-bid recommendation from AI. Free to start.

Source: Find a Tender Service — UK Cabinet Office. Open Government Licence v3.0. Updated 12 October 2026.