Ross-on-Wye Lengthsman Scheme
Ross-on-Wye Town Council
Description
Schedule of Works for Ross-on-Wye 1) Highway Gully Maintenance General a) All gullies shall be inspected prior to the commencement of any maintenance, all litter, stones, branches, and other debris that have the potential to cause personal injury or damage to machinery, equipment and installations shall be removed and disposed of by the Contractor. b) The Contractor shall take clear before and after photographs of each gully inspected and/or cleaned, as part of the due diligence requirements for Herefordshire County Council. Standard a) Should the Contractor cause damage to the surface or gullies during maintenance operations whether or not the Authorised Officer has agreed to such operations take place, the Contractor shall reinstate such damage to the satisfaction of and within the time period stipulated by the Authorised Officer. In failing to do so, the Authorised Officer may instruct other persons to carry out such work with the cost of so doing being deducted from monies due to or becoming due to the Contractor or recovered as a debt. b) To ensure the programme of gully cleaning is efficient it is good practice to use the recorded silt levels when determining the frequency of cleaning. For example, if a gully is more prone to becoming full of silt and therefore working less effectively then it will be programmed for more frequent cleaning. This may mean that some gullies are cleaned more than once a year and others will be cleaned less than once a year. c) The gully cleaning programme is designed to clean all known gullies at least once during the year. d) Missed gullies should be revisited at the earliest opportunity to ensure that maintenance is carried out. Any broken or damaged gully lids must be reported to the Authorising Officer, jammed gullies should be freed from all obstructions and every effort must be made to carry out programmed maintenance. e) Where it is apparent that problems exist that cannot be dealt with through gully cleaning operations or routine maintenance activities or where there are capacity issues in the underlying drainage network, such issues must be brought to the attention of the Authorising Officer. f) The Contractor is to provide an Annual Maintenance Plan, which is to be approved by the Authorising Officer prior to any work commencing. Specification of works a) Each gully on B,C & U classification of roads within Ross-on-Wye will be visited at least once per contract year (Appendix C) b) Out let pipes must be checked to ensure that they are not blocked or silted up. If they are found to be silted up, then this must be removed as far as it is practical to do so and jetted to ensure water flow. c) A record of completed gullies must be submitted to the Authorised Officer containing a list of road names and number of gullies completed, plus any gullies missed along with any that are requiring remedial action, accompanied by clear before and after photographs. 2) The Environment a) The Contractor shall ensure that every effort is made to prevent pollution of the environment and harm to human health. Where possible and practical, only biodegradable, non-toxic, non-hazardous materials and substances shall be used in carrying out the Service. b) The Contractor shall take all necessary preventative measures to ensure that no aqueous waste or contaminated water arising from the provision of the Service enters the public waterways, or watercourses. c) The Contractor shall take all reasonable precautions to minimise noise from any vehicles, plant and machinery used in the delivery of the Service. d) The Contractor shall make arrangements to ensure that litter and organic waste e.g. leaves are segregated to enable recycling and composting. 3) Waste disposal (including organic waste) a) The Contractor shall be registered to the satisfaction of the Council, prior to Commencement of the Contract, as a waste carrier and shall meet all costs in connection with this registration. b) Unless …
- 45232452 Drainage works
- 90640000 Gully cleaning and emptying services
More tenders
Read tender packs in minutes, not hours
Upload the tender documents to Planium and get a compliance matrix, risks and a bid/no-bid recommendation from AI. Free to start.
Source: Find a Tender Service — UK Cabinet Office. Open Government Licence v3.0. Updated 12 October 2026.