Open data · NYC Open Data
Building permits in ZIP 10039 (Harlem (North)), New York City
311 building permits were issued in ZIP 10039 (Harlem (North)), New York City over the last 12 months — #154 of 200 ZIP codes in New York City and 0.2% of the city total. Median declared value: $47,600 (1.1× the city-wide median).
Permits, 12 months
311
#154 in New York City
Median declared value
$47,600
Total declared value
$327.3M
Top permit type
Sidewalk Shed
82 permits
Permits issued per month
Oct 2024Oct 2026 (to date)
Show as table
| Month | Permits issued |
|---|---|
| Oct 2026 | 12 |
| Sep 2026 | 23 |
| Aug 2026 | 40 |
| Jul 2026 | 7 |
| Jun 2026 | 41 |
| May 2026 | 47 |
| Apr 2026 | 18 |
| Mar 2026 | 15 |
| Feb 2026 | 18 |
| Jan 2026 | 34 |
| Dec 2025 | 7 |
| Nov 2025 | 22 |
| Oct 2025 | 27 |
| Sep 2025 | 17 |
| Aug 2025 | 18 |
| Jul 2025 | 21 |
| Jun 2025 | 29 |
| May 2025 | 25 |
| Apr 2025 | 20 |
| Mar 2025 | 20 |
| Feb 2025 | 50 |
| Jan 2025 | 22 |
| Dec 2024 | 16 |
| Nov 2024 | 23 |
| Oct 2024 | 35 |
Find leads: new permits in ZIP 10039 (Harlem (North)), New York City
Planium watches the register for you and sends the new permits that match your trade and project size.
Permits by type (last 12 months)
| Permit type | Permits | Share |
|---|---|---|
| Sidewalk Shed | 82 | 26.4% |
| General Construction | 76 | 24.4% |
| Suspended Scaffold | 32 | 10.3% |
| Mechanical Systems | 23 | 7.4% |
| Plumbing | 19 | 6.1% |
| Construction Fence | 19 | 6.1% |
| Sign | 11 | 3.5% |
| Structural | 9 | 2.9% |
| Protection and Mechanical Methods | 9 | 2.9% |
| Sprinklers | 8 | 2.6% |
| Foundation | 6 | 1.9% |
| Supported Scaffold | 6 | 1.9% |
| Boiler Equipment | 4 | 1.3% |
| Full Demolition | 2 | 0.6% |
| Earth Work | 2 | 0.6% |
| Standpipe | 1 | 0.3% |
| Support of Excavation | 1 | 0.3% |
| Solar | 1 | 0.3% |
Largest permits of the last 12 months
Ranked by declared value. Owner, applicant and contractor names are not shown.
| Address | Work | Declared value | Issued |
|---|---|---|---|
| 159-30 Harlem River Drive Manhattan | General ConstructionModerate rehabilitation of existing 14-story multi-family building, including kitchens, bathrooms, and apartment interior renovations per drawings. New window installation and ufas construction included. No change in use, egress, and occupancy. | $43.6M | Jun 8, 2026 |
| 159-38 Harlem River Drive Manhattan | General ConstructionModerate rehabilitation of existing 14-story multi-family building, including kitchens, bathrooms, and apartment interior renovations per drawings. New window installation and ufas construction included. No change in use, egress, and occupancy. | $24.1M | Jun 5, 2026 |
| 159-48 Harlem River Drive Manhattan | General ConstructionModerate rehabilitation of existing 14-story multi-family building, including kitchens, bathrooms, and apartment interior renovations per drawings. New window installation and ufas construction included. No change in use, egress, and occupancy. | $23.1M | Jun 5, 2026 |
| 159-26 Harlem River Drive Manhattan | General ConstructionModerate rehabilitation of existing 14-story multi-family building, including kitchens, bathrooms, and apartment interior renovations per drawings. New window installation and ufas construction included. No change in use, egress, and occupancy. | $23.0M | Jun 5, 2026 |
| 159-20 Harlem River Drive Manhattan | General ConstructionModerate rehabilitation of existing 14-story multi-family building, including kitchens, bathrooms, and apartment interior renovations per drawings. New window installation and ufas construction included. No change in use, egress, and occupancy. | $22.8M | Jun 5, 2026 |
| 159-64 Harlem River Drive Manhattan | General ConstructionModerate rehabilitation of existing 14-story multi-family building, including kitchens, bathrooms, and apartment interior renovations per drawings. New window installation and ufas construction included. No change in use, egress, and occupancy. | $22.6M | Jun 8, 2026 |
| 159-70 Harlem River Drive Manhattan | General ConstructionModerate rehabilitation of existing 14-story multi-family building, including kitchens, bathrooms, and apartment interior renovations per drawings. New window installation and ufas construction included. No change in use, egress, and occupancy. | $22.3M | Jun 8, 2026 |
| 159-14 Harlem River Drive Manhattan | General ConstructionModerate rehabilitation of existing 14-story multi-family building, including kitchens, bathrooms, and apartment interior renovations per drawings. New window installation and ufas construction included. No change in use, egress, and occupancy. | $22.3M | Jun 5, 2026 |
Frequently asked questions
How many building permits were issued in ZIP 10039 (Harlem (North)), New York City?
311 permits in the last 12 months — 0.2% of all permits in New York City, ranking #154 of 200 ZIP codes. The most common type was Sidewalk Shed (82).
What is the median permit value in ZIP 10039 (Harlem (North)), New York City?
$47,600 across permits with a declared value, 1.1× the city-wide median ($42,000). Total declared work: $327.3M.
Nearby in the ranking
- 10471 Riverdale-Spuyten Duyvil · 367 permits
- 11694 Breezy Point-Belle Harbor-Rockaway Park-Broad Channel · 364 permits
- 11417 Ozone Park · 360 permits
- 10474 Hunts Point · 353 permits
- 11436 Baisley Park · 335 permits
- 11427 Oakland Gardens-Hollis Hills · 318 permits
- 10475 Co-Op City · 309 permits
- 10040 Washington Heights (North) · 308 permits
- 11369 East Elmhurst · 307 permits
- 11414 Howard Beach-Lindenwood · 305 permits
- 10281 Financial District-Battery Park City · 279 permits
- 10302 Port Richmond · 273 permits
Source: DOB NOW: Build – Approved Permits (NYC Department of Buildings), NYC Open Data. Licence: NYC Open Data Terms of Use (public, free to reuse). 12-month window from Oct 1, 2025. Declared values are applicants’ estimates and are not verified; personal names are omitted. Generated Oct 9, 2026.