SI 2010/2214, Schedule 1In forcePart H: Drainage and waste disposal

Building Regulations 2010 H5

Separate systems of drainage

Official text

H5. Any system for discharging water to a sewer which is provided pursuant to paragraph H3 shall be separate from that provided for the conveyance of foul water from the building.

Limits on application

Requirement H5 applies only to a system provided in connection with the erection or extension of a building where it is reasonably practicable for the system to discharge directly or indirectly to a sewer for the separate conveyance of surface water which is—

(a) shown on a map of sewers; or

(b) under construction either by the sewerage undertaker or by some other person (where the sewer is the subject of an agreement to make a declaration of vesting pursuant to section 104 of the Water Industry Act 1991).

What does it mean?

What does this provision mean for your project?

Planium reads the provision together with your own drawings and specs and gives you a concrete answer: what is required, who is responsible and what to check.

Ask Planium about this provision