Open data · NYC Open Data
Building permits in ZIP 10306 (New Dorp-Midland Beach), New York City
1,595 building permits were issued in ZIP 10306 (New Dorp-Midland Beach), New York City over the last 12 months — #32 of 200 ZIP codes in New York City and 0.9% of the city total. Median declared value: $42,750 (1.0× the city-wide median).
Permits, 12 months
1,595
#32 in New York City
Median declared value
$42,750
Total declared value
$509.2M
Top permit type
General Construction
330 permits
Permits issued per month
Oct 2024Oct 2026 (to date)
Show as table
| Month | Permits issued |
|---|---|
| Oct 2026 | 6 |
| Sep 2026 | 213 |
| Aug 2026 | 143 |
| Jul 2026 | 174 |
| Jun 2026 | 174 |
| May 2026 | 122 |
| Apr 2026 | 256 |
| Mar 2026 | 97 |
| Feb 2026 | 52 |
| Jan 2026 | 104 |
| Dec 2025 | 79 |
| Nov 2025 | 79 |
| Oct 2025 | 96 |
| Sep 2025 | 119 |
| Aug 2025 | 93 |
| Jul 2025 | 140 |
| Jun 2025 | 98 |
| May 2025 | 115 |
| Apr 2025 | 137 |
| Mar 2025 | 148 |
| Feb 2025 | 72 |
| Jan 2025 | 94 |
| Dec 2024 | 91 |
| Nov 2024 | 159 |
| Oct 2024 | 136 |
Find leads: new permits in ZIP 10306 (New Dorp-Midland Beach), New York City
Planium watches the register for you and sends the new permits that match your trade and project size.
Permits by type (last 12 months)
| Permit type | Permits | Share |
|---|---|---|
| General Construction | 330 | 20.7% |
| Plumbing | 230 | 14.4% |
| Structural | 199 | 12.5% |
| Foundation | 196 | 12.3% |
| Mechanical Systems | 138 | 8.7% |
| Construction Fence | 127 | 8.0% |
| Solar | 126 | 7.9% |
| Earth Work | 98 | 6.1% |
| Curb Cut | 40 | 2.5% |
| Full Demolition | 36 | 2.3% |
| Sprinklers | 34 | 2.1% |
| Sign | 17 | 1.1% |
| Sidewalk Shed | 7 | 0.4% |
| Boiler Equipment | 5 | 0.3% |
| Antenna | 4 | 0.3% |
| Protection and Mechanical Methods | 4 | 0.3% |
| Support of Excavation | 2 | 0.1% |
| Suspended Scaffold | 1 | 0.1% |
| Supported Scaffold | 1 | 0.1% |
Largest permits of the last 12 months
Ranked by declared value. Owner, applicant and contractor names are not shown.
| Address | Work | Declared value | Issued |
|---|---|---|---|
| 751 Mill Road Staten Island | StructuralRepurpose existing air plenumn into new elec room; install new direct-buried electrical cables & cmu vestibules; replace hvac & electrical equip & roofing membrane, arch upgrades, existing floor slab struct reinforcement, framing new roof/floor openings | $52.7M | Aug 4, 2026 |
| 751 Mill Road Staten Island | General ConstructionFiling here general construction work related to demolition of equipment, concrete pads, repairs, patch and repaint related to replacement and installation of sludge thickening equipment in main building. No change in use, egress or occupancy. | $9.4M | Oct 6, 2025 |
| 216 Clawson Street Staten Island | StructuralRemove & Replace existing , Roofing systems, Parapets, bulkhead doors & Sills, steel lintels, windows,& guards. Repoint all masonry joints at all elevations, broken bricks replacement, replace Sealants at masonry openings. Interior ceiling plaster repairs | $7.5M | Mar 19, 2026 |
| 751 Mill Road Staten Island | General ConstructionConstruction of Water Main Loop throughout the site, connecting at two RPZ chambers and at the Dewatering Building and Installation of new Stainless Steel grating over the Chlorine Contact Tanks. | $5.5M | Feb 19, 2026 |
| 465 New Dorp Lane Staten Island | Mechanical SystemsReplace existing air handling units, exhaust fans, and return fan. Balance airflows in existing classrooms, offices and toilets to match existing design CFM. Replace existing HVAC controls with BACnet BMS. | $5.3M | Apr 27, 2026 |
| 751 Mill Road Staten Island | General ConstructionFiling herewith: Basement FLR - New resinous floor for Polymer Storage area; FLR 001 - Intumescent paint under ELEC control room; Roof - Partial Removal and Replacement of Roofing on Main Building. No Change in use or occupancy. No major change in egress. | $4.0M | Aug 27, 2026 |
| 2424 Hylan Boulevard Staten Island | FoundationProposed interior alteration for an auto dealership with accessory service and repair & site work for re-striping existing accessory parking area to allow for required parking spaces, display area for new vehicles storage area | $3.0M | Jul 8, 2026 |
| 751 Mill Road Staten Island | Mechanical SystemsReplacement of existing supply and exhaust fans and associated ductwork, air conditioning for electrical rooms, redirecting existing exhaust ductwork, and new supply fans and electric unit heaters for pressurized vestibules. | $2.6M | Apr 14, 2026 |
Frequently asked questions
How many building permits were issued in ZIP 10306 (New Dorp-Midland Beach), New York City?
1,595 permits in the last 12 months — 0.9% of all permits in New York City, ranking #32 of 200 ZIP codes. The most common type was General Construction (330).
What is the median permit value in ZIP 10306 (New Dorp-Midland Beach), New York City?
$42,750 across permits with a declared value, 1.0× the city-wide median ($42,000). Total declared work: $509.2M.
Nearby in the ranking
- 11205 Fort Greene · 1,760 permits
- 11206 East Williamsburg · 1,737 permits
- 10029 East Harlem (South) · 1,675 permits
- 10128 Upper East Side-Carnegie Hill · 1,664 permits
- 11231 Carroll Gardens-Cobble Hill-Gowanus-Red Hook · 1,653 permits
- 10312 Annadale-Huguenot-Prince'S Bay-Woodrow · 1,629 permits
- 10018 Midtown-Times Square · 1,582 permits
- 11212 Brownsville · 1,579 permits
- 11223 Gravesend (East)-Homecrest · 1,515 permits
- 10027 Morningside Heights · 1,505 permits
- 10309 Annadale-Huguenot-Prince'S Bay-Woodrow · 1,460 permits
- 11220 Sunset Park (Central) · 1,447 permits
Source: DOB NOW: Build – Approved Permits (NYC Department of Buildings), NYC Open Data. Licence: NYC Open Data Terms of Use (public, free to reuse). 12-month window from Oct 1, 2025. Declared values are applicants’ estimates and are not verified; personal names are omitted. Generated Oct 9, 2026.